Project control software

Project control software that connects plan, cost and status.

Most systems can tell you what a project reported. Flowr holds the business case, the baseline, the plan, submitted time, the approved budget and the forecast on one record, and produces the status report from them — so the position a project claims can be checked against the evidence it came from.

The control row of a Flowr project overview. Budget consumed reads 163,527.46 euros of 192,000 approved at 85 per cent, with 31,417.60 awaiting validation and 13,918.10 not yet submitted. Forecast at completion reads 218,207.46 euros, 13.6 per cent over approved. Actual effort reads 99 per cent, 1,519.6 of 1,540 hours logged. Progress reported reads 75 per cent across 32 tasks, 23.4 points behind the effort spent. Below them: four open risks of which two are high, three open issues of which two are overdue, schedule on track with no slippage, and delivery pressure on track across ten tasks in flight.
Four measurements of the same project, side by side, taken from the same record. The effort figure is counted; the progress figure is reported.
Why control breaks

Nothing has to go wrong for the numbers to stop agreeing.

Control usually ends up spread across systems that were each a sensible choice on their own. None of them is wrong. They simply have no way of contradicting one another, so nothing does.

  • The plan lives in a scheduling tool that does not know what anything cost.
  • Progress is a percentage somebody types, against a baseline that may have moved since it was agreed.
  • Timesheets go to payroll or to a billing system, and never meet the plan they were spent on.
  • The budget is a spreadsheet, and the forecast is last month’s spreadsheet with two cells changed.
  • The status report is written last, from all four, by the person with the least reason to report a problem early.

A project can report Green through every one of those steps and still be over. Not because anyone lied — because no two of the five numbers were ever asked to reconcile.

One control model

One record, from justification to roll-up.

Flowr is not four tools with connectors between them. The business case, the baseline, delivery, effort, cost, forecast and reporting are stages of one project record, so each stage is measured against the one before it rather than against a copy of it.

  1. Business case
  2. Plan & baseline
  3. Delivery
  4. Financial control
  5. Reporting
  6. Portfolio

Each stage is checked against the one before it, not against a copy.

The business case is snapshotted at approval rather than overwritten, so closure has something to compare against. The baseline is kept beside the live plan for the same reason. Submitted time becomes actual cost at the rate in force on the date it was worked — so a rate change next month does not rewrite what last month cost.

See the full lifecycle, stage by stage

The delivery signal

Effort is counted. Progress is reported. The gap is the question.

Because timesheets and the plan sit on the same record, Flowr can compare what a project has spent with what it says it has finished. When those two diverge, it says so, and names the tasks that caused it.

How the delivery signal works
Progress reportedEffort consumed
0%25%50%75%100%wk 1wk 5wk 10wk 1530 points apart by week 1066%94%

This is advisory, and deliberately so. A project 94% through its effort at 66% reported progress may be badly estimated, front-loaded, or genuinely in trouble; Flowr does not know which. It raises the question early enough to be worth asking and puts the evidence next to it. The project manager still answers it.

Explore evidence and control

Financial control

A forecast you can take apart.

Approved budget, actual cost, estimate to complete and estimate at completion in one model, with variance computed against two references — because being over the plan and being over the approved budget are different problems with different escalation paths.

Flowr's budget page. Across the top: approved budget 192,000 euros, actual cost 145,971, estimate to complete 54,680, estimate at completion 200,651, variance to approved plus 8,651 and variance to baseline plus 20,603. Budget status is green, inside the 5 percent tolerance. Below, the approved budget's change history: a 12,000 euro increase approved by the Steering Committee under reference SC-2026-07.
The forecast sits €20,603 above the baseline plan and 4.5% above the approved budget — inside a 5% tolerance, so it is green and still worth watching.
Traceable to the day

Every labour cost traces to submitted time, the rate in force on that date, and a period closed on a specific day.

Never priced at zero

Work Flowr cannot cost is reported as uncosted exposure rather than quietly counted as nothing.

Overrides are decisions

Override the modelled EAC and it is stored with a reason and an author, not applied as a silent edit.

Explore financial control

Tolerances and governance

Decide once what off track means.

Tolerances are set for the organisation, not per project, so amber means the same thing everywhere and portfolio status is comparable. Warning and critical are separate numbers, because deciding to watch something and deciding to stop it are separate decisions.

Flowr's tolerance settings. A master switch enables the alerts, and beneath it cards for Budget, Schedule, Milestones and Stage and Gate, each with a Warning and a Critical threshold — budget variance 5 and 10 percent, schedule slippage 7 and 14 days, milestone overdue 1 and 7 days.
Organisation defaults. A project 7% over budget has passed the first threshold and not the second, in every project that uses them.
  • Rules, not a language model

    The project control assistant applies your thresholds to the project record and shows the evidence behind each signal. It is deterministic, so the conversation starts at what to do rather than at whether it is right.

  • Findings you can close

    Acknowledge a control issue with a recorded reason, assign it to a person, and clear it when it is resolved. Either way the answer stays on the record.

  • Gates that hold

    Which stages need a decision before work continues comes from an organisation template, not from a convention people are expected to remember.

  • Roles that mean something

    Fifteen PRINCE2 and PMI roles ship ready to assign. Naming someone Project Assurance lets them see the project; it does not let them edit or approve anything.

Explore governance

Evidence-based reporting

The report is produced from the record, not beside it.

The monthly status report is assembled from the same project data everything else on this page describes — milestones, risks, progress, effort, cost and forecast — and then edited and signed by the project manager. It is not a separate document that has to be kept in step with the project by hand.

A submitted Flowr status report for Infrastructure Modernisation, August 2026. Overall status On Track, with a chip showing the previous period was Minor. The narrative states the project is at week 15 of 22 and that the forecast is 4.5 percent over the approved budget, inside the 5 percent tolerance. Separate ratings follow for Scope, Budget, Planning, Resources and Quality; Budget is amber, reporting 145,971 euros incurred of 192,000 approved and a forecast of 200,651 at completion.
The report as the project team submitted it, and the measurement underneath it.

How project status reporting works in Flowr

Portfolio

The roll-up is the same evidence, not a second copy.

Portfolio budget, timeline and cross-project milestones are computed from live project data. There is no separate portfolio model to maintain, and therefore no month in which the two quietly stop agreeing.

The Projects table on Flowr's portfolio budget page. Three rows: Infrastructure Modernisation, approved 192,000 euros, forecast 200,651, variance plus 8,651 in red; Customer Portal Revamp, variance minus 109,069 in green; Billing Platform Migration, forecast completion 15 December 2026 marked plus 46 days. The last column, Last PSR, reads 2026-08 for the first project and Never for the other two.
Each row carries the figures that project reports on its own budget page — including which projects have never reported at all.

What this looks like for a PMO running the portfolio

Start

See it against a project you already know.

The fastest way to judge a control system is to point it at a project whose real position you can already argue about. Early access is granted one workspace at a time so we can set it up against yours.